SMC Networks SMC-EZ1024DT Manual de usuario Pagina 27

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 32
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 26
C
ABLES
15
Adjusting Existing Category 5 Cabling to Run
1000BASE-T
If your existing Category 5 installation does not meet one of the
test parameters for 1000BASE-T, there are basically three measures
that can be applied to try and correct the problem:
1. Replace any Category 5 patch cables with high-performance
Category 5e cables.
2. Reduce the number of connectors used in the link.
3. Reconnect some of the connectors in the link.
Vista de pagina 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32

Comentarios a estos manuales

Sin comentarios