Smc-networks 24/16 Manual de usuario Pagina 19

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 31
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 18
I
NSTALLING
THE
S
WITCH
8
Before rack mounting the switch, pay particular attention to the
following factors:
Temperature: Since the temperature within a rack
assembly may be higher than the ambient room
temperature, check that the rack-environment temperature
is within the specified operating temperature range.
Mechanical Loading: Do not place any equipment on top
of a rack-mounted switch.
Circuit Overloading: Be sure that the supply circuit to the
rack assembly is not overloaded.
Grounding: Rack-mounted equipment should be properly
grounded. Particular attention should be given to supply
connections other than direct connections to the mains.
Make sure twisted-pair cable is always routed away from
power lines, fluorescent lighting fixtures and other sources of
electrical interference such as radios and transmitters.
Make sure that a properly grounded power outlet is within 8 feet
(2.44 meters) of the switch and is powered from an independent
circuit breaker. As with any equipment, using a filter or surge
suppressor is recommended.
Vista de pagina 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 30 31

Comentarios a estos manuales

Sin comentarios